Turn construction cost data into commercial intelligence.

costify turns your BoQs, CSAs and tender returns into a private, structured cost database.

  • Cyber Essentials Plus certified
  • Never used to train shared AI models
  • No shared data pool

Backed by Innovate UK BridgeAI and The Alan Turing Institute

Every project arrives in a different shape.

Your history is the best benchmark you have. But reclassifying a BoQ against your framework takes days, so it stays in the folder and your most experienced people keep re-keying it by hand.

  1. Bills of quantities

    Trade sections, preambles and spacer rows, laid out for printing, not for analysis.

  2. Pricing schedules

    Five levels of numbering, and the context for every line lives in the headings above it.

  3. Cost summaries

    Lump sums by element, locked in a PDF, with no breakdown behind them.

  4. Tender returns

    Three contractors, three layouts, and "Incl. in 3.2" where a number should be.

  5. Final accounts

    Variations in a scanned PDF, where an O can pass for a 0.

Chapter 1 of 5 · Sort

Upload it messy. Get it back sorted.

  1. Upload anything

    Excel, PDF, BoQs, CSAs and tender returns, exactly as they are.

  2. Rebuild the hierarchy

    Bills, sections and preambles become a tree, so every line keeps the headings above it.

  3. Classify every line

    Each item is mapped to NRM1 or your own framework, with its headings in view.

  4. Regroup by element

    Trade bills become elemental cost data you can total, compare and benchmark.

Classified to NRM1: 8 lines, 3 elementsSample data
DescriptionNRM1QtyUnitRateTotal
1 SUBSTRUCTURE2 entries£139,692.00
2 SUPERSTRUCTURE4 entries£1,086,990.00
3 INTERNAL FINISHES2 entries£230,790.80
Trench fill foundations, C25 concrete1.1.1186m³£142.00£26,412
Ground bearing slab, 250mm, C32/401.1.31,180m²£96.00£113,280
Structural steel frame, fabricate and erect2.1.1214t£2,850.00£609,900
Composite metal deck slab, 150mm2.2.13,460m²£84.50£292,370
Curtain walling, aluminium, incl. brackets2.5.1990m²£160.00£158,400
Internal door, 1000 x 2200mm, incl. ironmongery2.8.147nr£560.00£26,320
Carpet tiles to offices, incl. underlay3.2.12,960m²£34.75£102,860
Static-dissipative resilient flooring to technical rooms3.2.11,240m²£103.17£127,931
Total, ready to benchmark£1,457,472.80

Chapter 2 of 5 · Classify

Fluent in every taxonomy that matters.

The same bill, read once. Pick the framework your team, your client or your board works in and watch every line regroup. Nothing is re-keyed.

Classify this bill to

Or your own framework. We build a knowledge bank around the codes your firm already uses.

Site works bill8 lines · classified to NRM1Sample data
Site works bill classified to RICS New Rules of Measurement 1. Sample data.
GroupDescriptionCodeTotal
1 SubstructureExcavate for foundations, not exceeding 2m deep1.1.1£23,940
1 SubstructureIn situ concrete C32/40 in bases1.1.1£68,880
2 SuperstructureStructural steelwork, fabricate and erect2.1.1£609,900
8 External worksStrip topsoil average 150mm deep and stockpile on site8.1.2£26,880
8 External works300mm concrete storm drain in trench, 1.5 to 2m deep8.6.1£121,464
8 External worksPrecast concrete kerb, half battered, bedded and backed8.2.1£84,475
8 External worksAsphalt surface course, 40mm8.2.1£143,080
8 External worksSteel vehicle safety barrier, single sided8.4.1£48,792

Sample mapping for illustration. NRM1 and MasterFormat shown at item level, NRM2 at work-section level, CESMM4 at class level, MMHW at series level.

Rate search
Type a description and get a range in seconds: min, P25, median, P75 and max, with the sample size shown so you know how far to trust it.
Composite metrics
Any rate over any denominator. £/m² GIA, £/MW, £/key, £/km. Save the query and run it again in one click.
Project and element totals
How much did concrete cost on the last job? Totals by any mapped taxonomy, without re-summing a spreadsheet.
Audit trail
Every rate traces back to its parent element, package, sheet tab and original description. When a number is challenged, the answer is immediate.
Knowledge banks
We build classification rules with your team. Once live, every upload applies your standards automatically, and you own the ruleset.

Chapter 3 of 5 · Check

Your team checks it.

  1. See what needs a look

    High-confidence lines go straight through. Medium and low confidence lines wait for you.

  2. Read why

    Every code comes with its reasoning and the alternatives that were considered.

  3. Keep, change or search

    Accept it, pick an alternative or search the full code list.

  4. It gets sharper

    costify learns your organisation’s classification preferences from the decisions your team validates. Your data is never used to train shared AI models.

Classification validationAll 8 lines validated · 6 automatic, 1 kept, 1 changedSample data

Source hierarchyBILL B-4 › FINISHES (09 65 00)

Static-dissipative resilient flooring to technical rooms

Quantity
1,240.00
Unit
m²
Rate
£103.17
Total
£127,930.80

Current classification

3.2.1Finishes to floorsValidated by you

Why this classification

The line describes a resilient floor finish to technical rooms. NRM1 3.2.1 Finishes to floors covers resilient sheet and tile coverings, and static-dissipative flooring is a functional variant of these.

3.2.2 Raised access floors was considered and rejected: this is the finish itself, not a platform floor.

Confidence is medium because "technical rooms" sometimes signals a specialist flooring system.

Source hierarchyBILL B-4 › DOORS & WINDOWS (08 11 13)

Curtain walling, aluminium, incl. brackets

Quantity
990.00
Unit
m²
Rate
£160.00
Total
£158,400.00

Current classification

2.5.1External enclosing wallsChanged by you

Why this classification

The bill lists this line under DOORS & WINDOWS, which points to 2.6 Windows and external doors.

But curtain walling is a complete wall system rather than an opening within a wall. NRM1 places curtain walling in 2.5 External walls.

Confidence is medium because the source heading and the description disagree.

All 8 lines validatedReady to benchmark. Every decision is recorded in the audit trail.

Chapter 4 of 5 · Compare

Then compare like with like.

  1. Line up your projects

    Comparable schools, offices or data centres from your own portfolio, by NRM1 element.

  2. Exclude what skews it

    Leave out an element for any project, like abnormal piling or off-site highway works. The benchmark recalculates without it.

  3. Rebase by location and inflation

    A 2024 Manchester job and a 2026 Bristol one, compared on the same basis.

  4. Use the metric your client uses

    £/m² GIFA or £/pupil place here. £/MW, £/key and £/km for data centres, hotels and roads.

Project comparison3 projects · £/m² GIFA (total ÷ GIFA)2 elements excludedRebased: London, Q3 2026
£/m² GIFA by NRM1 element for three schools, with two element costs excluded and every project rebased to London, Q3 2026. Demo data.
ElementBrightwater AcademyBrightwaterGIFA 10,400 m²London · Q3 2026Cedarbrook Learning CampusCedarbrookGIFA 16,200 m²London · Q3 2026Skymeadow STEM SchoolSkymeadowGIFA 18,700 m²London · Q3 2026Benchmarkmean of included
1 Substructure£85.12£91.52£101.42Excluded: abnormal piling£88.32
2 Superstructure£1,003.68£1,027.69£1,081.88£1,037.75
3 Internal finishes£167.67£166.58£151.52£161.93
4 Fittings, furnishings and equipment£125.09£112.76£119.25£119.03
5 Services£879.07£959.17£924.30£920.85
8 External works£272.94Excluded: off-site highway works£187.63£132.12£159.87
Total£2,260.63£2,545.36£2,409.06£2,487.75

Demo data. Pupil places, location factors and inflation indices are illustrative.

Chapter 5 of 5 · Export

Then take it anywhere.

  1. Export in one click

    Clean, classified Excel and CSV, structured the same way every time.

  2. Straight into Power BI

    The export is built for Power BI, so dashboards run on consistent data.

  3. Delivered to your data platform

    API access and delivery to your data lake or warehouse, set up for you on request.

  4. Ready for your AI

    Structured, validated cost data is what makes AI answers worth trusting.

Bill B-4, classified to NRM18 lines validated
  • 1 Substructure
  • 2 Superstructure
  • 3 Internal finishes
  • 1.1.1Trench fill foundations, C25 concrete
  • 1.1.3Ground bearing slab, 250mm, C32/40
  • 2.1.1Structural steel frame, fabricate and erect
  • 2.2.1Composite metal deck slab, 150mm
  • 2.5.1Curtain walling, aluminium, incl. brackets
  • Excel and CSV exportIncluded

    NRM1DescriptionTotal
    2.1.1Structural steel frame, fabricate and erect£609,900
    2.5.1Curtain walling, aluminium, incl. brackets£158,400
    3.2.1Static-dissipative resilient flooring to technical rooms£127,931
  • Power BIBuilt for it

    £33Substructure
    £259Superstructure
    £55Internal finishes
  • API, data lake and warehouseOn request

    { "project": "Bill B-4",
      "nrm1": "2.5.1",
      "description": "Curtain walling, aluminium, incl. brackets",
      "quantity": 990, "unit": "m2",
      "total": 158400, "validated": true }
  • Your AI toolsIllustrative

    What did we pay for curtain walling per m²?

    £160.00/m² on Bill B-4, coded 2.5.1 External walls and validated by your team.

Built for everyone who prices construction.

Build the cost database your competitors do not have.

Every project you deliver is a data asset. costify structures your project history, rates, packages and benchmarks into a private database that grows with your business.

What did we pay for rainscreen cladding on our last five office jobs?

Sample data
What did we pay for rainscreen cladding on our last five office jobs?
Leeds, offices, 2023£388/m²
Bristol, offices, 2023£401/m²
Manchester, offices, 2024£412/m²
Reading, offices, 2024£379/m²
Glasgow, offices, 2025£395/m²

Median £395/m² across 5 projects

The same structured data feeds Power BI dashboards and gives your AI initiatives a foundation they can trust.

Your data stays yours.

Built to enterprise security standards from day one, because a cost database is only valuable if it stays private.

Backed by

  • Innovate UK BridgeAI
  • The Alan Turing Institute
Reduction in manual data transformation
92%
Worth of projects transformed
£2bn+
  • Never used to train shared AI models

    Your data is processed for your organisation and nobody else.

  • No shared pool

    Benchmarks are built entirely from your own portfolio.

  • Cyber Essentials Plus

    Certified. ISO 27001 alignment in progress.

Start building your own cost intelligence database.

See costify working on a sample of your own documents.